Installation
Before installing the pool we need to accommodate indoor or outdoor space where we will put the pool, as well as buildings and road around it. If there is underground water is important to know its maximum level and to divert from the place where we will install the pool.
Space for the pool is made according to a preliminary drawing, and if they are accurately adhere to the given size, the costs of material and work will be smaller. The depth of the hole to comply with whether the client wishes the entire pool to be in the soil, or small part to remain above the surface. Pool embarks on concrete slab, which is perfectly washed from all junk and fiber post with a thickness of 2 cm outside the walls of the pool be affixed with a 3 cm thick Styrofoam against injury and better insulation. Minimum thickness of concrete slab is 150 mm and wire binding. It is important to take maximum leveling of the concrete slab because each curve would be seen when filling the pool with water, and will not be equal to the water surface.
The pool water is poured about 30 cm, then from outside manually buries with concrete about 30 cm. Continue upwards with concrete and in no case be tamped. Further, in leveling concrete with water, continue pouring water to 70 cm while infilling with concrete up to this height, which stop. The next day is still filled with water and pouring concrete in the same way as the previous day in 30-35 cm to the level of filling
Important: The water in winter, always should be minimum two thirds of the pool!